This project included space planning, putting up glass walls (the Structural and single glass Diamond Wall ranges), flooring, custom-made furniture for the reception area and the board table, wall cladding, bathroom configuration (wall and floor tiles, plumbing), shading techniques (roller blinds), wooden doors and central heating.